Installation of the furnace body
The electric furnace can be placed on the workbench to suit the physiological operating height of the human body, and the effective load of the workbench should be greater than 200KG.
Electrical installation
Power configuration: 220V (380V). According to the user's electric control cabinet configuration, the power should be greater than 4Kw.
The thermocouple is inserted into the furnace to a depth of 25mm, and the N-index compensation wire is used to connect with the temperature control instrument. Note: The quartz tube should be installed first and then the thermocouple, and the thermocouple should not be in contact with the quartz tube. The electric furnace and the control cabinet are grounded as a whole, and the grounding resistance of the grounding wire should be less than 4Ω.
Resistance wire wiring method: two in parallel, power supply: single-phase 220V (or 380V).

Check and tighten
Due to transportation and other reasons, the tightening of each screw of the furnace body should be checked to confirm that it is correct.
